MP Filtri had outgrown its existing space and needed a turnkey solution to provide a new design, production, and warehousing facility. The new premises would comprise of approx. 44,000 ft on three floors, consisting of warehousing, production, assembly, storage, and office accommodation.

  • Location:
  • Evesham
  • Value:
  • £5M

Evans Jones’s role was to oversee the project from inception to delivery including liaising with the developer on the clients’ behalf, ensuring that the specification met their requirements, negotiating costs, overseeing the tendering process and onsite works to ensure MP Filtri’s overall programme requirements are met. 

We provided the client with solutions throughout to ensure that their objectives, cost restraints and deadlines were met. 
 

The Results:
Evans Jones ensured that MP Filtri’s requirements were met by the developer team and appointed contractor, considering compliance, buildability, and quality.  Where changes were made, we also ensured that these would not affect tight budget or timescales.