<?xml version='1.0' encoding='UTF-8'?>
<rss version='2.0'>
<channel>
<title>Surveying News and Articles from Evans Jones</title>
<description>Latest entries from Evans Jones.</description>
<link>http://www.evansjones.co.uk/articles/</link>
<generator>Axi</generator>
<language>en-gb</language>
<item>
<pubDate>Mon, 12 May 2008 15:54:37 GMT</pubDate>
<title>Evans Jones appointed to manage rugby club planning application</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP was appointed in October 2007 by Hemel Hempstead Amateur Rugby League Football Club and Slick Developments Limited to manage the preparation of the planning application for a new 700 seat stadium, changing rooms, conference facilities and multi use games area at Pennine Way, Hemel Hempstead.<br />
<br />
Hemel Hempstead Amateur Rugby League Football Club (also known as Hemel Stags) First XIII have fixtures with teams nationwide playing in the Co-operative Rugby League Conference National and the Northern Rail Cup.  The rugby club&#8242;s rapidly developing profile in recent years and well supported youth development rugby programme, run in association with local schools, urgently called for new training and playing facilities.<br />
<br />
<h2>The Brief</h2>
<p>
Evans Jones initial remit was to consult with the local authority and to prepare and manage the planning application submission.  The requirement for the development to meet the needs of a range of users (the rugby club and general public), together with the size of the application, the site&#8242;s suburban location on a pocket of green open space (owned by the local authority), and restricted vehicular access, triggered the need for additional supplementary information to support the planning application.<br />
<br />
Due to these additional requirements Evans Jones remit expanded, involving the consultation and appointment of specialist consultants (e.g. Highways, Archaeological and Flood Risk) to carry out assessments and devise appropriate measures to create an appropriate design solution.<br />
<br />
<h2>The Challenge</h2>
<p>
The principle of a new stadium and associated facilities at the Pennine Way site was allocated in the Local Authority&#8242;s Local Development Plan.  A previous application for a similar scheme had also been approved in 1998, however due to excessive financial contributions required through the S106 Agreement the scheme was deemed unviable.<br />
<br />
The subsequent challenge faced by Evans Jones was to prepare a scheme to meet the requirements of the local authority, Sport England and the rugby club while negotiating appropriate S106 Contributions.  This involved in-depth discussions with the local authority&#8242;s planning, highways, legal, leisure and recreation departments at pre-application stage to ensure the scheme was viable in all respects.<br />
<br />
The planning application also had to be supported by a business plan setting out how the club anticipated to evolve over a 5&#226;&#128;&#147;10 year period, including details of fixtures and spectator numbers to provide comfort to the local authority on future potential impact from the development on the surrounding area.<br />
<br />
The agreed S106 Contributions included a commitment by the club to resurface the public car park that served the facility, financial contributions towards a new signage strategy along local cycle and pedestrian routes, and a management plan to deal with match day traffic.<br />
<br />
<h2>Benefits Achieved</h2>
<p>
The final design worked within the constraints of the site while making effective use of space.  In particular the benefits included: <br />
<br />
<ul>
<li>Design that related well to surrounding built forms</li>
<li>Layout that provided sufficient car and coach parking, and turning areas</li>
<li>Respected surrounding natural habitats (e.g. through use of floodlight cowling measures)</li>
<li>Layout that retained pedestrian connections in and around the site</li>
<li>Appropriate levels of security and natural surveillance</li>
<li>Supported the rugby club&#8242;s ethos of encouraging everyone to participate in sport through provision of a facility to benefit the community as a whole.</li>
</ul>
<blockquote>
&#8220;Working in partnership with the local authority planning, highways, leisure and legal departments to address matters at pre-application stage and the overall management by Evans Jones has been fundamental to the success of this project.&#8221;<br /><br />
<strong>Bob Brown, Club Chairman</strong>
</blockquote>
<p>
<br />
<h2>Summary</h2>
<p>
The nature of the rugby club&#8242;s evolving profile, and hence uncertainty in terms of the projected number of spectators, together with the application site being owned by the local authority and the requirements of a diverse range of users prompted working in partnership with the rugby club, local authority, Sport England and specialist consultants to prepare a scheme that met the requirements of all users.  The commitments made at pre-application stage were instrumental to the successful outcome of this planning application.<br />
<br />
For further information, please contact David Jones on 01242 531412 or david.jones@evansjones.co.uk.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2008/05/12/evans-jones-appointed-to-manage-rugby-club-planning-application</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2008/05/12/evans-jones-appointed-to-manage-rugby-club-planning-application</guid>
</item>
<item>
<pubDate>Mon, 28 Apr 2008 10:59:09 GMT</pubDate>
<title>Evans Jones builds on Travelodge success</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones, the Cheltenham-based firm of surveyors, architects, planners and access consultants, continues to build on its strong relationship with budget hotel operator, Travelodge. Instructions this year will see Evans Jones managing the creation of more than 700 new rooms across nine different sites.<br />
<br />
Evans Jones provides project management, building surveying and access consultancy services to Travelodge and has to date seen nine sites through from inception to successful completion, on time and on budget.<br />
<br />
Evans Jones multi-disciplinary service has enabled the firm to take on some of the more challenging Travelodge projects including the refurbishment of an existing 400 room hotel in central London, without closing the hotel, to ensure an uninterrupted experience for customers.<br />
<br />
Ian Eggleton partner heading up the firm&#8217;s Building Consultancy division said: &#8220;The fact that we have been appointed to deliver a further 700 rooms in 2008 demonstrates our client&#8217;s confidence in us to deliver. We have again been chosen to manage the delivery of new rooms in some of the most testing sites which is, I feel testament to the range of skills we are able to offer in house&#8221;.<br />
<br />
Ian continues: &#8220;Travelodge aims to treble the size of its estate by 2020 &#226;&#128;&#147; opening 4000 new rooms a year from 2008. This continued growth gives us confidence for the future and we expect to break the 1000 room mark in 2009&#8221;.<br />
<br />
- ends -<br />
<br />
For further information please contact Ian Eggleton on 01242 531413 or ian.eggleton@evansjones.co.uk.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2008/04/28/evans-jones-builds-on-travelodge-success</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2008/04/28/evans-jones-builds-on-travelodge-success</guid>
</item>
<item>
<pubDate>Mon, 31 Mar 2008 10:54:49 GMT</pubDate>
<title>Evans Jones and Big Sleep Hotel win prestigious award</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones, the local firm of surveyors, architects, planners and access consultants, was called in when entrepreneur Cosmo Fry of the famous Fry&#8217;s Chocolate family decided to convert Cheltenham&#8217;s former Inland Revenue offices in Wellington Street into a new hotel.<br />
<br />
Now the chic 62 bedroom property has received a Cheltenham Civic Society award for the restoration of a building or structure, during the annual civic awards ceremony at the Cheltenham Town Hall on March 26.<br />
<br />
The judges said: &#8220;This award marks the transformation of a previously dingy and unattractive former employment agency into a bright and welcoming hotel through comparatively simple measures.<br />
<br />
This was a commendable example of breathing new life into a tired and unloved building and a welcome addition to the town&#8217;s facilities.&#8221;<br />
<br />
Cosmo Fry said: &#8220;We appointed Evans Jones to provide an architectural design service that would support our strategy of creating a hotel that is modern, daring, practical, uncluttered, fresh and hip and they provided exactly what we set out to achieve.&#8221;<br />
<br />
John Everitt, Head of Architecture at Evans Jones said: &#8220;The hotel has become known as &#8216;retro-chic&#8217; using clean, crisp lines to enhance the sense of openness and space within the rooms, creating a fresh, stylish and uncluttered appearance.<br />
<br />
We look forward to continuing to work with The Big Sleep Hotel in Eastbourne, and also potentially in Brighton, Bournemouth, Southampton and Exeter.&#8221;<br />
<br />
Conversion of The Big Sleep Hotel in central Cheltenham took just over seven months to complete, with the hotel opening at the beginning of December 2006.<br />
<br />
<h2>Further information</h2>
<p>
The Cheltenham Civic Awards are organised by the Cheltenham Civic Society on behalf of Cheltenham Borough Council. Nominations are submitted by various parties including owners, architects, builders and members of the public, and are assessed by an independent panel of ten, appointed by the Civic Society, to represent a cross section of the community.<br />
<br />
Cosmo Fry&#8217;s brief to Evans Jones specified the need for a design which would create the following:<br />
<ul>
<li>clean and simple rooms that provided the essentials needed for either the short term business user or the weekend visitor 
</li>
<li>a stylish interior befitting a hotel with a higher star rating but at budget prices</li>
<li>innovative design solutions and a vivid pallet of colours and materials 
 </li>
<li>a finished product that stands out from the crowd amongst its contemporaries in the two star hotel sector </li>
<li>revitalizing a redundant building which was a wasted resource in the centre of the town 
bringing new customers to the surrounding bars and restaurants in Cheltenham.</li>
</ul>
<p>
Further information can be obtained from John Everitt at Evans Jones on 01242 531415 or john.everitt@evansjones.co.uk.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2008/03/31/evans-jones-and-big-sleep-hotel-win-prestigious-award</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2008/03/31/evans-jones-and-big-sleep-hotel-win-prestigious-award</guid>
</item>
<item>
<pubDate>Mon, 25 Feb 2008 11:28:09 GMT</pubDate>
<title>Private, age-restricted, sheltered accommodation</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Fairview New Homes Ltd (Fairview) provides affordable housing mainly, but not exclusively, for first time buyers in and around London. For over 35 years, Fairview has carved a reputation in the building industry for delivering consistent quality and value.<br />
<br />
To date, the company has built over 35,000 homes and each year, up to 2,000 new homes are completed. The company&#8217;s performance is a result of the harmonious integration of its land acquisition, planning, building, sales and marketing divisions.<br />
<br />
Fairview is the parent company of Rialto Homes Ltd (Rialto), who recently appointed Evans Jones LLP to provide technical construction drawings on a number of retirement developments in Bury St Edmunds, Brentwood and Caterham. It is the Caterham site that this case study refers to.<br />
<br />
Rialto was responsible for constructing the Caterham development and taking the scheme from planning approval, obtained by Fairview, through the working drawing process, securing approvals and consents, appointing sub-contractors and consultants to see the development through to final completion.<br />
<br />
<h2>The Brief</h2>
<p>
Located in a suburban setting, the Caterham site was originally occupied by a number of 1930s two-storey, semi-detached houses all addressing the main road, and dropping away steeply behind the houses, down to a railway line.<br />
<br />
<img src="http://www.evansjones.co.uk/articles/uploads/caterham.jpg" alt="Fairview Homes Caterham Site" class="smallleft" />It was a concern of the planners that the replacement building should not be any taller than the houses which originally occupied the site and the scheme was designed to resemble a number of units addressing the road rather than appearing as one large building.<br />
<br />
<h2>The Challenge</h2>
<p>
To achieve the number of units on the site that the client required, the new building had to stretch back further into the site than the original houses, and consequently the building needed to accommodate the extreme change in levels across the site.<br />
<br />
The central circulation core of the building is four storeys in height although the elevation to the road frontage is only two storeys in height. The building is effectively set into the hillside by two storeys and steps down as it stretches into the rear of the site. The building, where it addresses the gardens to the rear of the site, reduces in scale.<br />
<br />
It was a condition of the planning consent that the scheme generated 10 percent of its energy via a renewable energy source on site. The chosen method of renewable energy was a mixture of photovoltaic cells and solar panels; these were used to heat water which was used to heat the communal areas.<br />
<br />
Due to the changing levels across the site a number of complex roofs were required at different levels which intersected with one another and could not solely be supported on the masonry walls below. As such a steel frame had to be designed to sit under the roof itself sitting on wall plates at different levels and even on different storeys. Because the CAD package used by Evans Jones generates the drawings from a 3D model of the building, it was possible to  provide the structural engineer, and eventually the contractor, with a series of skeletal diagrams helping to explain the steel frame and its bearing points.<br />
<br />
As well as working with the design team to deliver the information necessary to build the project out to the contractor Evans Jones also dealt with and negotiated with local Building Control to ensure that the building was compliant in terms of the means of escape. This needed careful consideration on such a steeply sloping site, with limited access to the rear, and with a predominantly elderly population.<br />
<br />
<h2>Benefits Achieved</h2>
<blockquote>
&#8220;Evans Jones took the planning approved scheme to a full working drawing package for both construction and approval purposes. The package of drawings was both excellently presented, accurate in content and cross referencing. Evans Jones asked all the right questions and suggested solutions during the working drawing process.&#8221;<br />
<br />
Gary Bangs<br />
Group Design Manager, Rialto Homes Ltd
</blockquote>
<p>
<h2>Summary</h2>
<p>
Over the past few years Evans Jones has completed a range of projects providing private, age-restricted, sheltered accommodation for a number of developers.<br />
<br />
Typically these sites have been in suburban locations with good access to local amenities and facilities for their future residents. Some of the sites, however, have presented a number of design challenges for the developers, designers and construction teams alike.<br />
<br />
Working as part of a team in conjunction with the developer, the end operator and a number of other design consultants including mechanical and electrical engineers, structural engineers, acoustic consultants etc, Evans Jones has helped to construct close to 200 units.<br />
<br />
The buildings typically comprise of a range of one and two bed flats as well as a number of on-site communal facilities which vary from site to site but typically include residents&#8217; lounges, laundrettes, guest accommodation, hair dressing salons, commercial units to be let to local businesses, warden accommodation, external amenity spaces and landscaped surroundings.<br />
<br />
An increasing consideration is that of onsite renewable energy provision. Not only is this being driven by the recent changes in Building Regulations but also a number of the clients are becoming more attune to the potential to reduce the running costs of the development by introducing onsite provision of energy.<br />
<br />
With Evans Jones history of providing technical packages for many of the larger developers in the country including Bovis, Crest and Westbury, the consultancy is well placed to understand the requirements of developers working to a budget and tight timescales. Furthermore, Evans Jones has a sound technical knowledge base resulting in the provision of efficient and buildable solutions for developers and contractors alike.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2008/02/25/private-age-restricted-sheltered-accommodation</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2008/02/25/private-age-restricted-sheltered-accommodation</guid>
</item>
<item>
<pubDate>Mon, 28 Jan 2008 12:10:48 GMT</pubDate>
<title>New Big Sleep Hotel for Eastbourne</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP has been appointed to undertake the architectural and project management services for the third Big Sleep Hotel scheduled to open in Eastbourne in time for the Ladies Tennis Tournament in June 2008. <br />
<br />
Having worked on the second Big Sleep Hotel in Cheltenham a little over a year ago, Evans Jones will once again be working with Cosmo Fry, the owner of the Big Sleep Hotels, to convert a rather tired and unloved hotel formed out of three seafront Victorian buildings which, over the years, have been knocked together, altered and extended to create a 48 bed hotel.<br />
<br />
John Everitt, Head of Architecture at Evans Jones commented: &#8220;The hotel in Eastbourne provides us with an opportunity to further develop the Big Sleep template that was used in Cheltenham and adapt it to suit a different building type.&#8221;<br />
<br />
The project will involve gutting the existing hotel and taking the building back to its original structural form. Many of the light-weight walls and partitions which were added in the 70s and 80s will be removed as will all of the existing bathrooms and interior d&#233;cor. The hotel will then be put back together using the Big Sleep&#8217;s individual style including:<br />
<br />
<ul>
<li>modern minimalist d&#233;cor</li>
<li>a fresh and &#8216;clean&#8217; interior</li>
<li>contemporary fittings throughout</li>
</ul>
<p>
<br />
John Everitt continued: &#8220;In many ways, although the building is already being used as a hotel this project is more complicated than the building in Cheltenham where we had a blank canvas to start with. In Cheltenham the rooms were largely identical, stacking up from floor to floor. In Eastbourne the rooms are all unique, with varying sizes and ceiling heights. The services are already running though the building and this will inform on the location of bathrooms etc so there are far more restrictions on what we can and can&#8217;t do with the building.&#8221;<br />
<br />
The Big Sleep Hotel in Eastbourne will be designed to cater for the anticipated market in the area, and it is hoped that it will establish the &#8216;Big Sleep by the Sea&#8217; sub brand of the Big Sleep Hotel. Further sites are already being considered in Brighton, Bournemouth, Southampton and Exeter.<br />
<br />
<strong>Press enquiries:</strong><br />
<br />
John Everitt, Evans Jones<br />
Tel. 01242 531415<br />
Web site www.evansjones.co.uk<br />
Email enquiries@evansjones.co.uk
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2008/01/28/new-big-sleep-hotel-for-eastbourne</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2008/01/28/new-big-sleep-hotel-for-eastbourne</guid>
</item>
<item>
<pubDate>Thu, 6 Dec 2007 10:20:50 GMT</pubDate>
<title>Cheltenham Borough Employment Land Review</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[Past, Present and Future]]></description>
<link>http://www.evansjones.co.uk/articles/2007/12/06/cheltenham-borough-employment-land-review</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/12/06/cheltenham-borough-employment-land-review</guid>
</item>
<item>
<pubDate>Mon, 15 Oct 2007 10:57:56 GMT</pubDate>
<title>Housing and Planning Delivery Grant</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
The new <a href="http://www.communities.gov.uk/archived/publications/planningandbuilding/housingplanning" title="Housing and Planning Delivery Grant (HPDG)">Housing and Planning Delivery Grant (HPDG)</a> was released for formal consultation in July 2006 in wake of <a href="http://www.communities.gov.uk/housing/housingsupply/publicationshousing/" title="Kate Barker's Review of Housing Land Supply (2005)">Kate Barker&#8216;s Review of Housing Land Supply (2005)</a>.<br />
<br />
One of Barker&#8216;s key recommendations was to improve the speed, responsiveness and efficiency of the UK Planning System with a strong emphasis on quicker housing delivery.  Subsequently on 14th September 2007 Central Government unveiled &#163;500m HPDG across 3 years from 2008/09.<br />
<br />
The announcement of such significant funding arrangements for local planning departments based predominately on housing numbers, as opposed to the current assessment criterion of whether applications are being determined within target dates and &#8216;quality of service&#8217;, has raised serious speculation over whether Central Government has fully acknowledged the importance of design quality for future residential development.<br />
<br />
The current Planning Delivery Grant comes to an end in 2008.  On the current system David Jones comments, &#34;Statistically I am sure that it appears planning applications are now being determined quicker, however our experience on the ground is that many applicants are forced to withdraw and re-submit applications because planning officers do not have sufficient time to negotiate consents within the statutory period.  In practice the determination period is frequently doubled causing frustration for both applicants and their advisors&#34;.<br />
<br />
The proposed HPDG&#8216;s focus on delivery of housing numbers suggests that local authoritys in allocated growth areas (e.g. the South East) who have larger housing projections will ultimately receive more funding.  Conversely already under resourced local authoritys may feel under pressure to make quick, and potentially poor quality decisions in order to hit quantative targets.<br />
<br />
The Commission for Architecture in the Built Environment (CABE) National Housing Audit (2005) revealed that 8 out of 10 homes built in the last five years failed design quality tests.  CABE consequently called on Central Government to adopt <a href="http://www.cabe.org.uk/buildingforlife.aspx?bfl=true&contentitemid=383" title="Building for Life (BFL)">Building for Life (BFL)</a> standards based on 20 criteria for good design including character, roads, parking etc.<br />
<br />
David Jones, Head of Planning at Evans Jones LLP commented; &#34;the &#8216;carrot led&#8217; approach to funding for local planning authorities based on delivering housing numbers may encourage officers into making a quick decision at the cost of quality&#34;.<br />
<br />
The HPDG coupled with the profusion of prescriptive design guides is further cause for concern.  Current guidance at national and local levels includes: Supplementary Planning Guidance (SPG), Design Codes, Lifetime Homes Guidance, Development Briefs, Code for Sustainable homes and Scheme Development Standards all of which are designed to reinforce the objectives set out in PPS3 in relation to numbers, sustainability and delivery speed.  The greater emphasis upon quality of design is welcomed, however the abundance of design &#8216;dos and don&#8216;ts&#8217; for residential development risks stifling creativity and innovation.<br />
<br />
The cumulative effect of funding local planning departments based on delivering housing numbers, the abundance of prescriptive design guidance and the shortfall in planning officers with necessary skills to analyse development proposals leaves much doubt over whether the proposed HPDG funding regime will truly deliver the necessary levels of housing that will meet necessary sustainability and design quality standards.  It risks creating a &#8216;free for all&#8217; for housing developers to return to the days of simply building unremarkable estates simply to meet local authority housing targets.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/10/15/housing-and-planning-delivery-grant</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/10/15/housing-and-planning-delivery-grant</guid>
</item>
<item>
<pubDate>Mon, 24 Sep 2007 09:36:26 GMT</pubDate>
<title>Sustainable housing</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Housing currently contributes around 27% of UK CO2 emissions, with buildings as a whole bringing this figure to nearly 50%. Therefore, in order to have a hope of reaching legally binding emission reduction targets, and achieving more sustainable forms of development planning, design and construction processes, buildings must be made more sustainable. The aim is to make all residential construction carbon neutral by 2016.<br />
<br />
The Code for Sustainable Housing which came into force in England in April 2007, uses a scale of 1&#8211;6 to illustrate the sustainability of new homes with 1 being the minimum standard and 6 being awarded to a zero carbon home. Everything from the type of construction used through to the orientation of the property is factored into this assessment. <br />
<br />
At present the Code is voluntary but on the 23rd of July 2007 The Department of Communities and Local Government issued a consultation document, proposing to make rating new homes against the Code for Sustainable Homes mandatory. When this happens is yet to be agreed.<br />
<br />
In a time where we are all becoming more aware of our impact on the environment and the rising costs of fuel required to heat and power our homes, the provision of this information will allow purchasers to make informed decisions about the impact and lifetime cost associated with purchasing their homes. After all, when purchasing a car we enquire about not only the cost of running the car, but increasingly what impact it will have on the environment around us.  It seems a logical step that the same approach should be taken when purchasing a home. Obviously there are other deciding factors such as location, school catchment areas etc, but increasingly, environmental concerns are moving up the priority list.<br />
<br />
The introduction of the Code will see benefits for many different groups including house builders, social housing providers and consumers, not to mention the environment. It provides:
<ul>
<li>A mark of quality</li>
<li>Regulatory certainty</li>
<li>Lower running costs</li>
<li>Informed choice</li>
<li>Reduced environmental &#226;&#128;&#152;footprint&#226;&#128;&#153;</li>
<li>Reduced greenhouse gas emissions</li>
</ul>
<p>
John Everitt, Head of Architecture at Evans Jones comments: 
&#34;As a construction consultancy working in several sectors of the industry including planning, architecture, surveying and project management, Evans Jones has seen a growing interest in, and a move toward more sustainable forms of construction as a response to increasing concerns about the environmental impact we are all having on the planet. In fact, over the last 18 months Evans Jones has been approached by a number of individuals wishing to commission eco friendly homes.<br />
<br />
Some of this interest has been generated via revisions to legislation to improve the efficiency of buildings. Through the planning system, schemes are being approved with conditions attached, which require 10% of a building&#226;&#128;&#153;s energy to be generated via on-site renewable energy sources.&#34;
<h2>More sustainable methods of construction</h2>
<p>
 
75% of the residential schemes Evans Jones is involved in now use timber framed construction, with the timber being specified from renewable sources. And, as a practice Evans Jones has been involved in schemes using solar panels to heat water and bio mass boilers to provide heating. More recently Evans Jones has looked at a project using ground source heat pumps. <br />
<br />
Continuing, John says: &#34;In our opinion an important part of the process is selecting the most appropriate form of renewable energy for a scheme rather than the one with the most kerb appeal. We strongly believe that significant improvements in reducing the environmental impact of our future buildings can be made during the design / specification and construction stages of the building by specifying environmentally friendly products that reduce the amount of energy the building requires.&#34;<br />
<br />
&#34;At Evans Jones we believe it is better to construct a building which requires 20% less power to run than to add a wind turbine which may generate 5% of the power required, if the weather is right for it. Better still, both approaches should be used.&#34;
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/09/24/sustainable-housing</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/09/24/sustainable-housing</guid>
</item>
<item>
<pubDate>Mon, 3 Sep 2007 10:40:46 GMT</pubDate>
<title>Evans Jones reaches finals of Citizen &amp; Echo Business Awards</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[Design Excellence Awards]]></description>
<link>http://www.evansjones.co.uk/articles/2007/09/03/evans-jones-reaches-finals-of-citizen--echo-business-awards</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/09/03/evans-jones-reaches-finals-of-citizen--echo-business-awards</guid>
</item>
<item>
<pubDate>Mon, 13 Aug 2007 12:12:15 GMT</pubDate>
<title>Planning and architecture teams work hand in hand</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
<a href="http://www.redcliffehomes.co.uk" title="Redcliffe Homes">Redcliffe Homes </a>is one of the few privately managed house building companies in the South West of England and Wales.<br />
<br />
Concentrating on a small number of distinctively designed developments in carefully chosen locations throughout the South West, the company blends the traditional values of a family concern with the latest ideas and innovations in building. The company endeavours to offer its customers the best of both worlds, with a choice of homes that meet their needs in the most appropriate and appealing way.  <br />
<h2>The Challenge </h2>
<p>
Redcliffe Homes appointed Evans Jones LLP in August 2006 to obtain full planning permission and design of 24 units (nine of which were affordable housing) at Chartist Way, Gloucestershire. The site is located in Staunton and is an extension of an existing mid 1980&#226;&#128;&#153;s housing estate. <br />
<br />
Evans Jones is a Cheltenham-based architecture, planning and building consultancy, which has been in practice for over 30 years, providing professional consultancy services to the commercial sector. The firm specialises in development, project management, architectural design, town planning, disabled access and building surveying providing a complete end to end service for all construction requirements. <br />
<br />
Due to the multi-disciplinary nature of the Evans Jones service, the Architecture and Planning teams were able to review the outline consent and advise Redcliffe Homes as to how the consented scheme could be enhanced to increase the number of units as well as uplifting the internal floor areas provided by the units.   <br />
<h2>The Evans Jones Solution </h2>
<p>
At the outset of the project, the site in Staunton had outline consent for 20 units. However, in developing the brief, Redcliffe Homes required an increase in the number of units from 20 to 24. Certain preferences and detailing styles were taken from the surrounding Chartist and other dwellings surrounding the site and as set out in the local vernacular in the Design Guide.   <br />
<br />
<img src="http://www.evansjones.co.uk/articles/uploads/linedrawing1.jpg" alt="Drawing 1" class="smallleft" />Initially six different house types were to be used from their standard range. However, having visited the site Evans Jones felt that a larger range would allow for a more varied and village type feel, the desire for which was expressed in the Local Authority&#226;&#128;&#153;s Design Guide.  Evans Jones also felt that certain changes and revisions to the standard house types were necessary to help the scheme sit more comfortably within its surroundings.  As such, a total of ten house types were developed for the scheme, six from scratch and four with reference to the original six proposed.   <br />
<br />
It was a desire of all parties involved that the nine affordable housing units be integrated into the site and as such these were accommodated as a terrace of four units, a terrace of three units and a pair of semi-detached dwellings, which were integrated into the overall layout of the scheme. <br />
<br />
Due to the changes that were proposed to the layout of the scheme and some of the units, Evans Jones re-consulted with the Local Authority.  Primarily this was to address the increase in numbers. However, the issue of Design was also to be addressed as part of the Reserved Matter Application and given the proximity of some of the units to the listed Chartist Bungalows to the South of the site, it was important that the architectural detailing of the buildings took reference from the local vernacular architecture.  <br />
<br />
Representatives of both Evans Jones Architecture and Planning Divisions met with the Planning Officer and Conservation Officer to discuss the design of the units and the proposed variations to the site prior to submitting the application. Whilst it was acknowledged by all that due to the existing listed properties being bungalows, and the proposed being two storey, they were of a different scale. It was felt that due to inclusion of the vernacular detailing and careful choice of materials, the development was in keeping with the character of the surrounding dwellings and was responsive to the guidelines set out in the Forest of Dean Residential Design Guide.  <br />
<br />
<img src="http://www.evansjones.co.uk/articles/uploads/linedrawing2.jpg" alt="Drawing 2" class="smallright" />In the end the scheme was recommended for approval and was dealt with under delegated powers.    <br />
<h2>Benefits Achieved </h2>
<p>
On completion of the Evans Jones contract, Redcliffe Homes had achieved:
<ul>
<li>An increase in the number of units from 20 to 24 in total</li>
<li>An increase in the amount of saleable floor area due to the uplift in many of the units, plus an additional four units</li>
<li>A scheme which was approved under a Delegated Decision rather than having to go to committee where there was the potential for a refusal, even if Officers supported the scheme</li>
</ul>
<p>
Stuart Keene, Project Manager of Redcliffe Homes commented; &#8220;This project involved Evans Jones obtaining full planning permission and design for 24 units. The fact that their planning and architecture teams worked hand in hand to achieve this was a major benefit to the project.&#8221;
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/08/13/planning-and-architecture-teams-work-hand-in-hand</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/08/13/planning-and-architecture-teams-work-hand-in-hand</guid>
</item>
<item>
<pubDate>Mon, 6 Aug 2007 11:27:53 GMT</pubDate>
<title>Permission for redevelopment proposals at The National Star College secured</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP has secured Planning Permission for new residential, therapies, reception and educational accommodation at <a href="http://www.natstar.ac.uk" title="The National Star College">The National Star College</a>. <br />
<br />
Gaining permission was fundamental to the future of the College as an independent registered charity and an education provider for disabled people, allowing replacement of outdated and over-stretched accommodation at the Ullenwood site.  Through this the College will be able to continue its excellent nationally significant work with disabled young people and adults.<br />
<br />
It was agreed with a unanimous vote of Cotswold District Council&#8216;s Planning (Regulatory) Committee that the scheme, which has been more than 2 years in the developmental stages, has successfully balanced the need of the development with the special need to protect the Area of Outstanding Natural Beauty within which the site lies.  The endorsement of the College&#8216;s work conveyed by overwhelming support expressed by Members of the Committee at the meeting was welcomed by the College. <br />
<br />
The phased development will start on site this year with completion set for the end of 2009.  The College, through its advisors will continue close working relationships with Officers at Cotswold District Council, throughout the build process, to ensure that plans come smoothly to fruition. <br />
<br />
Diana Jones, Chartered Town Planner at Evans Jones comments:  &#8220;The permission has been the culmination of many months of hard work by all involved.  The support offered by the Council&#8216;s Planning Committee was overwhelming and is testament to the great and unique work undertaken by the College in its education, training and personal development of young people and adults with complex physical disabilities or acquired brain injuries together with associated learning behaviour, sensory or medical difficulties.<br />
<br />
Local and national planning policies are quite rightly set to protect the Area of Outstanding Natural Beauty from development pressure.  Development is allowed in only very exceptional circumstances.  In my mind there are very few more deserving of such special treatment and consideration as an exceptional case than the National Star College, without whom the lives of many young people and adults would be by far the poorer.&#8221;<br />
<br />
- Ends -
<h2>Press enquiries:</h2>
<p>
Diana Jones, Evans Jones - Tel: 01242 531412<br />
Email: dianaj@evansjones.co.uk<br />
David Jones, Evans Jones - Tel. 01242 531411<br />
Email: davidj@evansjones.co.uk<br />
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/08/06/permission-for-redevelopment-proposals-at-the-national-star-college-secured</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/08/06/permission-for-redevelopment-proposals-at-the-national-star-college-secured</guid>
</item>
<item>
<pubDate>Mon, 30 Jul 2007 09:03:24 GMT</pubDate>
<title>Repair and re-roofing of Edwardian Boarding House</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
The <a href="http://www.cheltladiescollege.org" title="Cheltenham Ladies College">Cheltenham Ladies College </a>is an independent school of world renown, accommodating more than 850 pupils. The College has a large property portfolio in the heart of Regency Cheltenham, much of which is of historic and architectural significance, both locally and nationally.<br /><br /><h2>Introduction</h2>
<p>
<img src="http://www.evansjones.co.uk/articles/uploads/glenleehousejpg.jpg" alt="Glenlee House" class="smallright" />Glenlee House is an Edwardian Boarding House, constructed by the College in 1901 by the architect Waller, in the Neo-Gothic style. The College utilises Glenlee House as a junior Boarding House for around 75 pupils.  <br /><br />The front elevation in particular incorporates a number of items of ornate stonework such as stone copings, corbels and balusters. <br /><br />Since its construction the facade had gradually become discoloured and this particularly affected the stonework, which in itself had eroded in many areas causing significant deterioration of the stone detailing. Equally the roof covering was unsightly and many of the slates had delaminated and deteriorated.   <br /><br />The property is locally listed under Cheltenham Borough Council&#8242;s Local Listing Scheme.<br /><br /><h2>The Brief</h2>
<p>
Evans Jones was appointed to design and implement a repair and restoration project to restore the front and also the side and rear elevations to their former glory.  As part of these works Evans Jones was also charged with re-covering the pitched roofs.<br /><br /><h2>The Challenge</h2>
<p>
Given the positioning of much of the stonework it was difficult to establish the extent of necessary repairs and thus the production of an accurate specification leading to an accurate price was a challenge.<br /><br />To overcome this Evans Jones commissioned a survey using both scaffold and cherry picker access to produce a detailed schedule of stonework repairs. This was prepared by the Evans Jones team of specialist Building Surveyors who are well versed in stone repairs, having worked for many years in the Regency Spa town of Cheltenham.  Indeed, one of Evans Jones Surveyors is a former Stonemason and was able to offer both detailed diagnosis and practical repair methods when dealing with stonework.<br /><br />The next major challenge was the programming of the works as the College was both unwilling to loose valuable boarding space and unable to allow works to continue whilst the Boarding House was in use for reasons of both privacy and security. To overcome this the work was split into phases with the very ornate front facade and frontal section of the roof being completed over one summer holiday, the remainder of the rear elevation and roof being completed the following year, with other more isolated elements being completed over the Easter and Christmas holidays.<br /><br />As the timescale itself was challenging the decision was made to negotiate with a contractor who assisted Evans Jones in working towards a practical and realistic programme. Evans Jones provided full design, building surveying and contract administration services throughout the project seeing it successfully through from inception to completion within the specified timeframe.   <br /><br /><h2>Benefits Achieved</h2>
<p>
Works were completed on time with no disruption whatsoever to operation of the Boarding House, either in terms of programme or damage to internal structure and finishes. The works resulted in a much improved external appearance to the front facade in particular, of what is still an impressive building.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/07/30/repair-and-re-roofing-of-edwardian-boarding-house</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/07/30/repair-and-re-roofing-of-edwardian-boarding-house</guid>
</item>
<item>
<pubDate>Mon, 23 Jul 2007 10:34:51 GMT</pubDate>
<title>Refurbishment of Grade II listed building</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
The <a href="http://www.cheltladiescollege.org/" title="Cheltenham Ladies College">Cheltenham Ladies College</a> is an independent school of world renown, accommodating more than 850 pupils. The College has a large property portfolio in the heart of Regency Cheltenham, much of which is of historic and architectural significance, both locally and nationally.<br />
<br />
<h2>Introduction</h2>
<p>
<img src="http://www.evansjones.co.uk/articles/uploads/fauconberghousev1_1.jpg" alt="Fauconberg House" class="smallright" />Fauconberg House is a Grade II listed building designed by notable architect Samuel Onley and constructed in 1847. It is one of the earliest buildings occupied by the College and has performed a number of functions over its history.<br />
<br />
The College&#8242;s long term plans for this area involved the construction of a new Art Block connected to the rear of Fauconberg House to provide state of the art facilities to the College&#8242;s pupils. <br />
<br />
Once it was decided to proceed with this new art facility the decision was then made to refurbish and re-use the impressive Fauconberg House to both provide a valuable facility in its own right and to compliment the new Art Block.   <br />
<br />
<h2>The Brief </h2>
<p>
Evans Jones was initially instructed to prepare a Feasibility Study for the external repair and restoration of Fauconberg House and its grounds, the relocation of the College&#8242;s Medical Centre and the formation of a conferencing and meeting facility within Fauconberg House.<br />
<br />
Following successful completion of the feasibility study Evans Jones was appointed as Lead Consultant acting as designers, surveyors and contract administrator for the repair, refurbishment and complete internal reorganization of Fauconberg House to achieve a modern facility in keeping with the brand new Art Block being constructed adjacent to it. <br />
<br />
 <h2>The Challenge</h2>
<p>
 
Due to its position on the periphery of the College&#8242;s Campus and the fact that it had been awaiting the construction of the new Art Block, the house and particularly the stucco render fa&#231;ade, were in need of repair and restoration before works commenced on the interior.<br />
<br />
Evans Jones, in negotiation with the Local Authority Conservation Officer, specified and procured the re-rendering and restoration of the stucco fa&#231;ade including restoration of ornate stucco pilasters which was designed and procured by Evans Jones experienced team of Building Surveyors.<br />
<br />
Luckily the bulk of the original features had been retained internally but this in itself presented challenges in terms of achieving a layout both suitable for the College&#8242;s intended use whilst still adopting a sensitive approach to the Listed Building.<br />
<br />
Again this was achieved in close consultation with the Local Authority Conservation Officer resulting in a layout which met, and in some cases exceeded, the College&#8242;s expectations.  This again was achieved by the Evans Jones Building Surveying team with support provided by the Evans Jones Planning team, at key stages.<br />
<br />
In terms of procurement of the works, a traditional detailed design and procurement route was chosen reflecting the unknown quantity of much of the works and the client&#8242;s desire for certainty over design elements and costs.  The main challenge in terms of contract administration was delivering the project on time in order to meet the opening date.<br />
<br />
In the role of Lead Consultant, Evans Jones managed a number of third party specialists including interior designers, fire engineers, damp proofing specialists and kitchen equipment installers, who all worked together to produce a very pleasing end result, in particular to the ground floor where the conferencing and meeting facilities have proved a great success.<br />
<br />
<h2>Benefits Achieved</h2>
<p>
 
Fauconberg House was restored to its former glory and now provides a gateway into the College for many visitors using the conferencing and meeting facilities for the first time.<br />
<br />
A new Medical Centre with all modern facilities was created within Fauconberg House, freeing up other space in the College which has now been used to create valuable boarding accommodation for pupils. <br />
<br />
The building was delivered on time to a high standard with the full cooperation and support of the Local Authority Conservation Officer. <br />
<br />
Following completion the building was put forward for a Civic Award which was achieved in 1999.   <br />
<br />
<h2>Summary</h2>
<p>
This property represented a challenge from the outset with many skills required to deliver a fully refurbished and restored building to meet the client&#8242;s expectations. <br />
<br />
Using its multi-disciplinary approach, including building consultancy and planning services, Evans Jones was able to deliver the majority of these services in house, leading to a streamlined approach and the all-important single point of contact for Cheltenham Ladies College.<br />
<br />
The building now forms one of the College&#8242;s first points of contact with parents and visitors, offering a conferencing and meeting facility for both the College and the local community. This is combined with a top class Medical Centre serving every pupil attending the College.
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/07/23/refurbishment-of-grade-ii-listed-building</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/07/23/refurbishment-of-grade-ii-listed-building</guid>
</item>
<item>
<pubDate>Mon, 14 May 2007 17:06:54 GMT</pubDate>
<title>Driving development forward for National Star College</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP, has re-submitted proposals for the development of new residential, therapies, reception and educational accommodation at The National Star College, Ullenwood.  The Cheltenham based company joined the Development Team comprising a number of specialists including Highways, Trees and Landscape and Ecology Consultants in preparing a detailed re-submission of the College&#226;&#128;&#153;s development plan application submitted to Cotswold District Council last year.<br />
<br />
The plans will allow the College, an independent registered charity and leading education provider for disabled people, to continue its excellent, nationally significant, work with disabled young people and adults. This has also been recognised by an exceptional pledge of significant financial support for the &#194;&#163;15.4 million pound project by the Learning and Skills Council (LSC).  The College has recently been recognised by the Adult Learning Inspectorate as one of the leading training providers in the country.<br />
<br />
Evans Jones, has advised and worked closely with specialist consultants and maintained close and consistent liaison with both Local Authority and County Council Officers to ensure that all potential issues and areas of concern have been satisfactorily addressed and that the needs of the development is balanced with the special need to protect the Area of Outstanding Natural Beauty within which this site lies.  Local residents and amenity groups have been invited to be involved in the process with a neighbour briefing held in late February which brought about some positive feedback to inform the process prior to submission.<br />
<br />
The Charity aims to raise over &#194;&#163;7 million over the next few years through charitable fundraising to realise the development plans and much needed accommodation to replace existing outdated and over stretched facilities.  <br />
<br />
Diana Jones, Chartered Town Planner at Evans Jones, comments &#34;The development proposals are essential to the future of the College in its provision of further education, training and personal development for young people and adults locally, regionally and nationally with complex physical disabilities or acquired brain injuries together with associated learning, behavioural, sensory or medical difficulties.  Existing accommodation is severely under pressure; teaching and specialist accommodation is undersized with space and mobility constraints for the high proportion of students in wheelchairs; and therapy accommodation needs to be updated to reflect the more complex needs of students now attending the College.<br />
<br />
Having been closely involved with the College over a number of months I never cease to be uplifted by the sight of the students going about their daily activities.  The quality of the students&#226;&#128;&#153; lives, lucky enough to achieve a place at the College, have been improved and enriched beyond words, with even the most severely disabled given opportunities to achieve qualifications or training and improve their personal independence.  It is truly humbling to see the spirit of these individuals and I am proud and honoured to have been a part of the Development Team responsible for assisting the College in achieving its goal.&#34;<br />
<br />
<strong>- Ends -</strong><br />
<br />
<strong>Press enquiries:</strong><br />
Diana Jones, Evans Jones<br />
Tel: 01242 531412<br />
Email: dianaj@evansjones.co.uk<br />
<br />
David Jones, Evans Jones<br />
Tel. 01242 531411<br />
Email: davidj@evansjones.co.uk
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/05/14/driving-development-forward-for-national-star-college</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/05/14/driving-development-forward-for-national-star-college</guid>
</item>
<item>
<pubDate>Mon, 2 Apr 2007 09:44:38 GMT</pubDate>
<title>Planning for Sustainable Waste Management (PPS10)</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
The arrival of PPS10: Planning for Sustainable Waste Management (July 2005) has impacted on the way in which Local Planning Authorities prepare Development Plans (Local Plans and Local Development Frameworks).<br />
<br />
Local Authorities are now under obligation to better integrate Waste Management within their policies. This requirement has consequently instigated the emergence of Supplementary Planning Documents (SPD) for Waste Minimisation in Development Projects.<br />
<br />
Gloucestershire County Council published SPD on Waste Minimisation in September 2006 which most notably introduced the requirement for all applications for Major Development to be supported by a Waste Minimisation Statement (WMS).<br />
<br />
<h2>Waste Minimisation Statements</h2>
<p>
<br />
The assessment criteria for WMSs require more than a broad commitment to sustainable waste minimisation.  The onus is on the developer to demonstrate how waste management is being addressed at all stages of the development process.  WMSs are required to provide details on projected waste materials and quantities, as well as the methods of monitoring and re-use during the design, demolition, and construction stages.  Furthermore waste management measures to be implemented during operation (e.g. recycling box/residual bin requirements) also need to be addressed.<br />
<br />
David Jones, Head of Planning at Evans Jones LLP commented;
&#8220;The initial response from planning professionals and developers with regard to the recently published Supplementary Planning Guidance on Waste Minimisation has largely been skeptical.<br />
<br />
Incorporating waste minimisation and the efficient use of building materials is crucial in reducing landfill and contributing to sustainability agendas.  The principal of waste minimisation in development is not refuted, reservation is however held over whether such information is being requested at the right stage.  For example there is often a degree of uncertainty regarding design and materials for schemes submitted in outline form. In this instance there will undoubtedly be a degree of ambiguity over the level of detail required.<br />
<br />
A more appropriate solution would be to request information on waste minimisation by means of a planning condition; once planning permission has been granted developers are in a better position to specify materials and detail construction plans, consequently integrating waste minimisation measures&#8221;.<br />
<br />
For many the requirement for WMSs is clearly another &#8216;tick in the box&#8217; to enable application registration.  However, WMSs have now become a material consideration and therefore development professionals will need to become familiar with their function to enable the successful determination of all applications for Major Development.<br />
<br />
 
Evans Jones is experienced in preparing Waste Management Statements for applications requiring Environmental Impact Assessments, of which predominately have the same assessment criterions as WMSs.  The Evans Jones cross-departmental alliance enables sharing of technical knowledge and more realistic waste minimisation measures to be identified that otherwise could not be achieved by planning consultants and architects alone.<br />
<br />
For more information on the implications of PPS10: Planning for Sustainable Waste Management and Waste Minimisation Statements please do not hesitate to contact Evans Jones Planning Division.<br />
<br />
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/04/02/planning-for-sustainable-waste-management-pps10</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/04/02/planning-for-sustainable-waste-management-pps10</guid>
</item>
<item>
<pubDate>Mon, 19 Mar 2007 10:03:20 GMT</pubDate>
<title>Evans Jones lands Jumbo job</title>
<author>karynm@evansjones.co.uk (Ian Eggleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP, the Cheltenham-based firm of surveyors, architects, planners and access consultants has been appointed as access consultants for the &#163;1billion redevelopment of the Elephant &amp; Castle area of London. <br />
<br />
The initial phase will involve the demolition of disused and dilapidated buildings which will be replaced with modern shops, leisure units and both private and student accomodation. Given the scale of the development this will become a landmark on the London skyline. This appointment continues Evans Jones involvement in some of the largest construction projects in the country including its role as access consultants for the &#163;980million redevelopment of Liverpool city centre.<br />
<br />
Evans Jones will work with the project design team providing advice to project architects and designers to ensure that the development is fully accessible to all users. Ultimately, Evans Jones will also be responsible for preparing an Access Statement for the scheme.<br />
<br />
Ian Eggleton, head of Evans Jones access consultancy division, commented: "An Access Statement is now required as part of the planning application for all but the very smallest developments. The statement sets out standards for access and how the design will achieve those standards. The importance of access on the political agenda continues to grow following the passing of the Disability Dsicrimination Acts in 1995 and 2005. With more than ten years experience in this sector, Evans Jones is well placed to help its clients through what can be seen as a minefield."<br />
<br />
 
Evans Jones offer access advice to all manner of clients from private indivduals to blue chip companies and can provide access statements, design guidance, access audits of existing buildings or even a complaint handling service.<br />
<br />
 
Ian concludes: &#8220;No project is too small, we have looked at buildings ranging from a one bedroom bed and breakfast up to a cathedral. Location is also not a barrier as we have already worked extensively in London, Edinburgh and Belfast."<br />
<br />
<strong>Press enquiries:</strong><br />
<br />
 Ian Eggleton, Evans Jones - Tel: 01242 531413<br />
Email: <a href="enquiries@evansjones.co.uk" title="enquiries@evansjones.co.uk">enquiries@evansjones.co.uk</a><br />
Web: <a href="www.evansjones.co.uk" title="www.evansjones.co.uk">www.evansjones.co.uk</a>
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/03/19/evans-jones-lands-jumbo-job</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/03/19/evans-jones-lands-jumbo-job</guid>
</item>
<item>
<pubDate>Mon, 26 Feb 2007 16:29:09 GMT</pubDate>
<title>Planning Policy Statement 3 (PPS3)</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
The Government's long awaited revision of Planning Policy Guidance Note 3 (Housing) has created a stir throughout the industry.</p>
<p>In launching <a href="http://www.communities.gov.uk/pub/931/PlanningPolicyStatement3Housing_id1504931.pdf " title="Planning Policy Statement 3">Planning Policy Statement 3 (PPS3)</a> the Government has placed much greater emphasis on Brownfield development, more flexibility for local authorities, affordable family housing, good design and tougher environmental standards.</p>
<p>The key policy directions are as follows:</p>
<ul>
<li>Local authorities must bring forward more appropriate land for housing, planning fifteen years ahead to prevent delays.</li>
<li>Housing and neighbourhoods must be well designed. Local planning authorities should turn down poor quality planning applications.</li>
<li>Planners must consider the environment, sustainability and the need to cut carbon dioxide omissions, together with wider environmental and sustainability considerations.</li>
<li>Local authorities must prioritise Brownfield development, but have the power to set their own standards.</li>
<li>Councils have more flexibility to decide where houses are built.</li>
<li>Affordable housing, especially in rural areas, is a priority.</li>
<li>National minimum threshold for affordable housing provision on all sites of fifteen or more dwellings. But authorities can set lower standards where justified on need.</li>
</ul>
<p>
Gone is the average density range of 30 to 50 dwellings per hectare, with local authorities able to set their own range in local development frameworks, provided that 30 dwellings per hectare remains the minimum density.</p>
<p>Authorities are required to consider the needs of children for the first time providing green spaces as well as more family homes. See <a href="http://www.communities.gov.uk/index.asp?id=1505061" title="companion guide">companion guide</a>.</p>
<p>Local authorities must maintain a rolling five-year supply of immediately deliverable land for housing.</p>
<p>It is interesting in reviewing the PPS, the number of times 'good design' is mentioned - virtually on every page. This coupled with design advice in PPS1 and the requirement for design and access statements for all but minor applications will hopefully empower local authorities to refuse consent for obviously inadequate designs.</p>
<p>In practice one must ask whether many authorities have the necessary skills to determine what 'good design' is. And conversely whether the industry has the motivation to pursue imaginative schemes.</p>
<p>David Jones, Head of Evans Jones Planning commented; </p>
<blockquote>
<p>Evans Jones submits applications throughout the country and already experiences huge variations from one local authority to another. Most local authority architectural departments were disbanded many years ago, thus planners must rely upon design advice provided by architectural panels (often not the most objective consultee). Some rely upon conservation officers, many of whom have a conservation / preservation agenda and do not possess the necessary skills to comment on good or bad design.</p>
<p>The commission for Architecture and the Built Environment (CABE) first national audit of new housing development makes grim reading.  According to the commission fewer than one in five developments are good or very good but 40% were found to be poor.</p>
</blockquote>
<p>
Time will tell how local authorities respond to the new challenges imposed by PPS3, however the very real concern is that the majority of local authorities simply do not have the resources to collect the necessary data to meaningfully respond to the requirement for housing to be responsive to local need, and designed to a constantly high standard responding to local distinctiveness.</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/02/26/planning-policy-statement-3-pps3</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/02/26/planning-policy-statement-3-pps3</guid>
</item>
<item>
<pubDate>Mon, 26 Feb 2007 12:26:52 GMT</pubDate>
<title>Travel Plan initiative launched</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP, the firm of surveyors, architects, planners and access consultants is practicing what it preaches by launching its own Travel Plan initiative. <br />
<br />
Travel Plans seek to reduce reliance on the private motor car by both employers and employees, by taking an active role in the means of transportation to and from the work place.<br />
<br />
David Jones, head of planning consultancy at Evans Jones said, 
</p>
<blockquote>
As a constituent part of many of the major applications handled by Evans Jones we produce travel plans which seek to encourage, in a structured manner, the reduction in non essential car usage. I realised very quickly that it was all very well the practice preaching to others how they should introduce initiatives encouraging alternative forms of transport, when as a practice we were doing little to support the initiative within our own office.
</blockquote>
<p>
<br />
Evans Jones new Travel Plan initiative includes:<br />
- Promoting public transport, walking and cycling<br />
- Managing the use of cars and encouraging car sharing<br />
- Providing office shower facilities and secure cycle parking<br />
- Removing the automatic right to allocated parking spaces<br />
- Facilitating working from home via remote access to the company computer system<br />
- Subsidising cycle purchases <br />
<br />
These simple measures have dramatically reduced reliance on the private motor car at Evans Jones and have demonstrated that there are positive measures that companies of all sizes can take to reduce car dependency. <br />
<br />
David confirmed, 
</p>
<blockquote>
Since the introduction of the scheme, I examined my own driving patterns and considered whether I really needed to travel to work by car.  I live a 20 minute walk from the office or a 10 minute cycle ride; I thus have viable alternatives to the motor car as a means of transport
</blockquote>
<p>
<br />
Evans Jones prepares Travel Plans for many small, medium and large companies, and the practices experience demonstrates that there are positive steps which can be taken to reduce car dependency, regardless of company size or geographical location.<br />
<br />
<strong></strong>Press enquiries:<strong></strong>
David Jones, Evans Jones - Tel. 01242 531411<br />
Web site www.evansjones.co.uk<br />
Email enquiries@evansjones.co.uk
</p>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/02/26/travel-plan-initiative-launched</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/02/26/travel-plan-initiative-launched</guid>
</item>
<item>
<pubDate>Mon, 5 Feb 2007 16:36:07 GMT</pubDate>
<title>New Liverpool cruise liner terminal to be accessible to all</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones LLP, the Cheltenham-based firm of surveyors, architects, planners and access consultants has won the access consultancy contract for the new cruise liner terminal to be constructed in Liverpool. The new terminal is intended to welcome the biggest liners in the world to the home of the Beatles, and the intended European City of Culture in 2008.
The Access Consultancy division of Evans Jones has been heavily involved in the redevelopment of Liverpool city centre over the past 12 months, and has landed this latest commission on the basis of its performance to date.
Nick Bevan, head of access consultancy at Evans Jones commented, "We were delighted to be recognised as leaders in the specialist area of Access Consultancy when appointed to advise on the city centre redevelopment of Liverpool last year; the largest construction project of its type in  Europe.  We have also been commissioned to undertake areas of specialist research for the urban design elements of the project. This latest contract win has been achieved by Evans Jones performing to a really high standard on the work commissioned to date. The sense of excitement at being involved in a long-term project of this type, with European significance, is a real compliment to the way Evans Jones conducts its business."
<h2>Press Enquiries:</h2>
<p>
<ul><li><a href="/company/team/#ian">Ian Eggleton</a>. Tel. 01242 531413</li></ul>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/02/05/new-liverpool-cruise-liner-terminal-to-be-accessible-to-all</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/02/05/new-liverpool-cruise-liner-terminal-to-be-accessible-to-all</guid>
</item>
<item>
<pubDate>Mon, 22 Jan 2007 12:48:09 GMT</pubDate>
<title>New Development planned on New Penny site in Cheltenham</title>
<author>karynm@evansjones.co.uk (Karyn Middleton)</author>
<description><![CDATA[
<p>
Evans Jones Planning, the chartered surveyor and town planning consultants, based in Cheltenham, have submitted proposals to demolish The New Penny public house to make way for a new site development of one-bedroom apartments.
</p>
<p>
The planning application for the Gloucester Road redevelopment proposal was submitted by Evans Jones following the closure of the New Penny pub in the summer of 2005, when the building fell into disrepair.  The application was made on behalf of RS Developments of Gloucester. 
</p>
<p>
Evans Jones plans to construct two brand new apartment buildings on the site, comprising 12 x 1 bed flats and 2 x 1 bed flats.
</p>
<p>
David Jones, head of planning, at Evans Jones, comments: "The current site needs this investment of capital in order to regenerate the immediate area. The scheme will not only improve the site and its surroundings, but will also help provide much-needed property for first time buyers.  If the planning application is accepted, we will work closely with RS Developments to ensure that the development is a real success."
</p>
<p>
<strong>ENDS</strong>
</p>
<h2>Press enquiries:</h2>
<p>
<ul><li>David Jones, Evans Jones. Tel. 01242 531411</li></ul>
]]></description>
<link>http://www.evansjones.co.uk/articles/2007/01/22/new-development-planned-on-new-penny-site-in-cheltenham</link>
<guid isPermaLink="true">http://www.evansjones.co.uk/articles/2007/01/22/new-development-planned-on-new-penny-site-in-cheltenham</guid>
</item>
</channel>
</rss>
